ABB

When Floorcare arrived onsite, ABB had a failing VCT tile floor down that was failing due to ASR present in the concrete. Floorcare partnered with ABB to design a functional flooring system for the low voltage products being manufactured in this building. The results were a beautiful, safe and low maintenance surface that has given our customer decades of service life.

Client:

ABB

Installation Date:

2003-present

Concrete System:

Moisture system to address ASR present in concrete, trowel down epoxy mortar system and electrostatic dissipative coating system.

Total Sq.Ft.

95,000 sq ft